Finished Projects

 
Finished Projects
  • Upstream

 row  project  Client
 1  Petrophysical cut-offs values determination based on petrophysical analysis and core data in order to increasing accuracy of hydrocarbon reservoirs estimation in Darkhoein field, west of Karun River  Arvandan Oil and Gas Company (AOGC)
 2  Biostratigraphy and Micropaleontological Studies on the Cutting Samples in Five wells  NIOC-EXPLORATION DIRECTORATE
 3  Geological Study on the Drilled Cutting & Core Samples of Southern Part of Khazar basin (Range chart, correlation chart and Final Report  KEPCO
 4  Core Studies (Rcal & Scal) on five samples from drilled wells  NISOC
 5  Preparation and Palynology Studies on two sections in Central of Iran Basin  NIOC-EXPLORATION DIRECTORATE
 6  Fractures Characterization Using Discrete Fracture Network Modeling (DFN) in One of The AGOC’s Oil Fields  Arvandan Oil and Gas Company (AOGC)
 7  Geochemical studies of Kashafrood formation (middle Jurassic) and source rock determination of hydrocarbons in Kopet Dagh basin  NIOC-EXPLORATION DIRECTORATE
 8  Sequence Stratigraphy (Field operation and related Studies), Regional Tectonic (Field operation and related Studies), Geochemical studies, and Paleontological Studies of Taybad basin in North East of Iran  NIOC-EXPLORATION DIRECTORATE

  • Midstream
 row  project  Client
 1  Inspection of buried pipeline with combination of ECDA& MST methods.  National Iranian South Oilfield Company (NISOC)
 2  Inspection of aboveground pipelines with Contact-MST method  Iranian oil pipeline and telecommunication Company
 3  Repairing of Maroon gas pipelines with Zerehloole(Composite Sleeves)  Maroon oil and gas producing company
 4  Assessment of pipelines coating with C-Scan method  National Iranian Gas Company
 5  Assessment of pipelines coating by DCVG method  National Iranian Gas Transmission Company- 3th District of Gas Transmission Operation
 6  MST Research Project  Iranian oil pipeline and telecommunication Company
 7  Assessment of pipelines coating with DCVG/CIPS/C-Scan methods  National Iranian Gas Transmission Company- 2th District of Gas Transmission Operation
 8  Assessment of pipelines coating with DCVG/CIPS methods  National Iranian Gas Company - Isfahan
 9  Assessment of pipelines coating with DCVG/CIPS/C-Scan/GPS methods  Permayon and National Iranian Gas Transmission Company- 5th District of Gas Transmission Operation
 10  Assessment of pipelines coating with DCVG/CIPS/C-Scan/GPS methods  Permayon and National Iranian Gas Transmission Company- 2th District of Gas Transmission Operation
 11  Assessment of pipelines coating with DCVG/CIPS /GPS methods  Permayon and National Iranian Gas Transmission Company- 5th District of Gas Transmission Operation
 12  Assessment of pipelines coating with DCVG/CIPS/C-Scan methods  Permayon and National Iranian Gas Transmission Company- 5th District of Gas Transmission Operation
 13  Inspection of buried pipeline with Non-Contact MST methods  PetroChina
 14  Assessment of pipelines coating with DCVG/CIPS methods  Mapna Development company
 15  Installation of Zerehloole(Composite Sleeves) on Maroon gas pipelines  Maroon oil and gas producing company